Due to high application volume, processing times may be delayed.
Eligible homes may secure a 25%–35% lower monthly energy cost through a solar + battery pathway. No loans. No credit checks. No debt.
Property Added: $145/mo Electricity Bill reduced to $98/mo Fixed Rate.
Property Added: $112/mo Electricity Bill reduced to $83/mo Fixed Rate.
Property Added: $223/mo Electricity Bill reduced to $172/mo Fixed Rate.
1. Property Eligibility Review
We confirm whether the home fits the 2026 RE-UP Rate Protection Pilot before any project pathway is presented.
2. Solar + Battery Suitability Check
We review roof conditions, electrical setup, and other site factors needed for a solar-plus-battery installation pathway.
3. Utility Cost & Rate-Lock Fit Review
Current utility usage and rate exposure are reviewed to determine whether the pilot structure appears favorable for the property.
4. Enrollment in RE-UP
If the home qualifies, we will present you with your customized fixed-payment structure and next-step actions.
RE-UP Pilot Benefits
25%–35% Lower Monthly Cost
Eligible homes may secure a lower monthly energy cost than standard utility power through the pilot pathway.
No Loan / No Credit Check
The RE-UP pilot program is structured without traditional financing. NO credit pulls. NO income verification. NO money out of pocket. Approval is based on property eligibility.
Fixed Rate-Lock Structure
Approved homes receive a fixed monthly payment structure that does not rise with future utility rate increases.
Self-Reliance & Independence
Your home becomes a Residential Power Plant. You produce, store, and consume your own power. Solar + Battery improves energy resilience and provides predictable monthly costs.
Your privacy is strictly protected. Your utility data is used solely to create your custom residential power plant and is never sold to third-party marketing agencies.
The Utah Energy Registry operates as an independent entity. Should your property be eligible for infrastructure upgrades, we exclusively recommend implementation partners who have passed a rigorous, 50-point certification process. This ensures any work performed meets the highest standards of safety, ethics, and engineering excellence.
Strategic Notice: Due to the projected 5-year surge in regional electrical consumption driven by hyper-scale data center development, the Registry is prioritizing residential infrastructure updates to ensure long-term grid stability for Utah homeowners.
Phone: 385-600-5711 Email: [email protected] Site: www.ut-energyregistry.org Privacy Policy Terms of Service
